The 7.1 MWP Roanhead Farm Solar Park, located very close to the coast in North-West England, was connected to the grid on 26 March 2015. The Solar Park fully meets the special corrosion protection requirements for this location.

CTF Solar and CTIEC constructed the Roanhead Farm Park under challenging winter weather conditions, in less than one month, and in parallel with another 40 MW project.